Our customers want to maximize their cost savings, and we do this in two ways.
First, a manure ditch is dug under the stall, and the cement manure slatch replaces the original composite manure slatted board as the floor system for the entire fattening crate.
Second,the aisle between the wall and the slot has been eliminated. the fatten crate is built against the wall, and the wall is used as part of the crate.